![]() ![]() All existing house check valves shall remain in place until completion of the demolition work. The red paint required pursuant to Section 905.11 shall be maintained during any demolition operations. ![]() Standpipe hose, nozzles and spanners are not required to be maintained and may be removed at any time. Cutting and capping of standpipes during demolition work shall be performed only by a licensed master plumber or licensed master fire suppression piping contractor who has obtained a permit for such work. At the commencement of demolition, the standpipe risers shall be capped above the outlet on the floor immediately below the floor being demolished so as to maintain the standpipe system on all lower floors for Fire Department use.